Completed Projects

Current - Available for new contracts

2015 - July 2017 - Project Forwarding Contarct with major EPC.

Review of Freight Forwarder contracts on Oil & Gas Exploration, cost, service and performance.

2008 - 2014 - Load-Outs & Discharges for UK & Overseas Forwarding, Construction & Engineering Companies

Loading Supervision, Transport Arrangements and Services at Site, Dock side and Airport.

2010 to 2014 - French Consultancy Group

12 Factory relocations including:

Birmingham / Slovenia - Presses

Scotland - Turkey - Microchip Manufacturing Plant

Wales - Thailand - Injection Moulding Factory

2013 - Eddie Stobart Ltd / Britvic Soft Drinks Ltd

Relocation of Soft Drinks Manufacturing Plant UK / France - Pricing, Pre-Shipment Preparation, Shipment Planning, Arranging Heavy Haulage, Supervision of Loading & Securing, Transit Documentation, On site 6 weeks.

2012 - Irish Based Heavy Haulier

UK Loading Supervision - Various UK locations.

2011 - Logistics Presentation to Journalists from the National, Local and Trade Press

On behalf of a Major Oil & Gas Player.

2011 - Italian Freight Forwarder

OOG Cargo Movements to Libya

2011 - UK Based EPC

Overseas Procurement Contract

2010 - UK Based EPC

Review and Revamp of Forwarding Tender Procedures

2010 - Major Indian Chemical Company

Relocation of Fertiliser Plant Immingham / Dubai.

2009/10 Sanford (Europe) Ltd - Parker Pen Company

Relocation of remaining Pen Manufacturing Factory from Newhaven to China and France. Pricing, Pre-shipment Preparation, Packing, shipment by Air & Sea.

2009 - Major German Project Forwarder

Deugro (Deutschland) Projekt GmbH, provision of HSEQ Procedures and implementation.

2009 - Ceva Freight (UK) Ltd / Siemens Industrial Turbomachinery Ltd.

To supply emergency In-Plant coverage at Lincoln site for a major Gas Turbine Manufacturer in Lincoln, the commission is to complete staff training in Heavy Lift & Out of Gauge movement, complete documentation services, and design and implement procedures for the continued success of the In-Plant services. Obtained contract for 2 Charter movements for Petrofac, Sharjah. 54 weeks.

2008/9 Sanford (Europe) Ltd - Parker Pen Company

Relocation of Pen Manufacturing Assembly Line from Newhaven to China, France, Eastern Europe and UK. Pricing, Pre-shipment Preparation, Packing, shipment by Air & Sea. 8 weeks.

2008 - Abnormal Load Services Ltd., Hull

Assess and make improvements to Project Department. Provide Systems Analysis for new Quality System. Implement Quality & Health, Safety & Environmental System, Train staff and management. 28 weeks.

2008/9/10 - Shell Malaysia / SA Kargo, Malaysia

Load Out: 5 consignments of Umbilicals ex Duco Ltd., via Shepherds Offshore, Newcastle, including supervision of returned empty reels. 18 weeks.